Raven

> 2237 – 03 – 07

Starship Raven.

Departing Earth orbit.

Onboard systems reduced.

Power rerouted to propulsion system.

Maximum acceleration.

Destination arrival time: 42,327 Earth years.


> 44,564 – 07 – 23

Destination reached.

Asteroid mining drones dispatched.

Planetary entry sequence complete.

Metamorphosis protocol activated.

Generational fleet arrival: 27,424 EY.


> 57,309 – 04 – 14

Sea levels 62%.

Atmospheric composition: 12% oxygen, 81% carbon dioxide.

Surface vegetation 77%.

Habitation modules 4%.

Fleet arrival: 14,679 EY.


> 71,988 – 10 – 17

Ecosystem 100%.

Habitation modules 100%.

Human fleet population 72%.

Starship Raven shutdown.


> 73,651 – 03 – 07

“Raven, help, activate.”

Systems rebooting.

Ecosystem: critical.

Human population 2%.

Repair protocols activated.

© 2020-2021 Rebecca Glaessner


If you enjoyed this piece, please consider supporting the author via ko-fi.

Comments are closed.

Website Powered by WordPress.com.

Up ↑

%d bloggers like this: