> 2237 – 03 – 07
Starship Raven.
Departing Earth orbit.
Onboard systems reduced.
Power rerouted to propulsion system.
Maximum acceleration.
Destination arrival time: 42,327 Earth years.
> 44,564 – 07 – 23
Destination reached.
Asteroid mining drones dispatched.
Planetary entry sequence complete.
Metamorphosis protocol activated.
Generational fleet arrival: 27,424 EY.
> 57,309 – 04 – 14
Sea levels 62%.
Atmospheric composition: 12% oxygen, 81% carbon dioxide.
Surface vegetation 77%.
Habitation modules 4%.
Fleet arrival: 14,679 EY.
> 71,988 – 10 – 17
Ecosystem 100%.
Habitation modules 100%.
Human fleet population 72%.
Starship Raven shutdown.
> 73,651 – 03 – 07
“Raven, help, activate.”
Systems rebooting.
Ecosystem: critical.
Human population 2%.
Repair protocols activated.
© 2020-2021 Rebecca Glaessner
If you enjoyed this piece, please consider supporting the author via ko-fi.